of floods. As this portion of the Mullah or Canal cannot be availed of by boats as the lower part can, I propose to continue the walls in

ashlar undressed or

with square joints. beds, set flush in Mortar and backed with rough (not granite ) laid day and

and grouted course level with face work, concrete 2 ft thick will be

the work proceeds to prevent the percolation of water and the return of the loose sandy backing forming the Roadway. The cop stone will be beaden 1 foot square feet long, the work to be executed by Contract :-

added also as

The Estimate in detail is slightly in excess of the vote by Council but if possible the expenditure will be confined to the rose.

No. 38.)

Willah at

REPORT AND ESTIMATE No.1 OF 1864

DATED

January 1864

PARTICULARS. LABOUR. MATERIALS TO BE PURCHASED. MATERIALS TO BE ISSUED FROM STORES. PORTION OF WORK TO BE PERFORMED BY CONTRACT. Forward C. C. $ C $ Casualties,... 9806 TOTAL,... 980 $10786.60 TOTAL. C. $ G 2677 129

Surveyor General.

Edit History

2026-05-19 04:58:08 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
scour or face by 础到 cort of floods. As this portion of the Mullah or Canal cannot be availed of by boats as the lower part can, I propose to continue the walls in ashlar undressed or with square joints. beds, set flush in Mortar and backed with rough (not granite ) laid day and and grouted course level with face work, concrete 2 ft thick will be the work proceeds to prevent the percolation of water and the return of the loose sandy backing forming the Roadway. The cop stone will be beaden 1 foot square feet long, the work to be executed by Contract :- added also as The Estimate in detail is slightly in excess of the vote by Council but if possible the expenditure will be confined to the rose. No. 38.) Willah at REPORT AND ESTIMATE No.1 OF 1864 DATED January 1864 PARTICULARS. LABOUR. MATERIALS TO BE PURCHASED. MATERIALS TO BE ISSUED FROM STORES. PORTION OF WORK TO BE PERFORMED BY CONTRACT. Forward C. C. $ C $ Casualties,... 9806 TOTAL,... 980 $10786.60 TOTAL. C. $ G 2677 129 Surveyor General.
Baseline (Original)
scour or face by 础到 cort of floods. As this portion of the Mullah or Canal cannot be availed of by boats as the lowe part can, I propose to continue the walls in t ashlar undressed or with square joints. beds, set flush in Mortar and backed with rough (not granite ) laid day and and grouted course level with face work, concrete 2 ft thick will b the work proceeds to prevent the percolation of water and the return of the lis sandy backing forming the Roadway. The cop stone will be beaden 1. foot square feet long, the work to be executed by Contract :- added also as The Estimate in detail is slightly in ea of the vote by Council but if possible the expen time will be confined to the rose. No. 38.) Willah at REPORT AND ESTIMATE Nɔ/ƒ OF 1864 DATED January 186/4 PARTICULARS. LABOUR. MATERIALS TO BE PURCHASED. MATERIALS TO BE ISSUED FROM STORES. PORTION OF WORK TO BE PERFORMED BY CONTRACT. Forward C. C. $ C Casualties,... TOTAL,... TOTAL. C. $ G 9806 980 $1078660 Surveyor General. 2677 129
2026-05-19 04:58:08 · Baseline
View content

scour

or face

by

础到

cort

of floods. As this portion of the Mullah or Canal cannot be availed of by boats as the lowe part can, I propose to continue the walls in t

ashlar undressed or

with square joints. beds, set flush in Mortar and backed with rough (not granite ) laid day and

and grouted course level with face work, concrete 2 ft thick will b

the work proceeds to prevent the percolation of water and the return of the lis sandy backing forming the Roadway. The cop stone will be beaden 1. foot square feet long, the work to be executed by Contract :-

added also as

The Estimate in detail is slightly in ea of the vote by Council but if possible the expen time will be confined to the rose.

No. 38.)

Willah at

REPORT AND ESTIMATE Nɔ/ƒ OF 1864

DATED

January 186/4

PARTICULARS.

LABOUR.

MATERIALS

TO BE PURCHASED.

MATERIALS

TO BE

ISSUED FROM STORES.

PORTION

OF WORK TO BE PERFORMED

BY CONTRACT.

Forward

C.

C.

$

C

Casualties,...

TOTAL,...

TOTAL.

C.

$

G

9806

980

$1078660

Surveyor General.